Phone: (817) 478-1137

info@speedfabcrete.com

Speed Fab-Crete Bridge Systems

SFC Bridge Systems, a division of Speed Fab-Crete Corporation, designs, manufactures and assists in the installation of 3-sided concrete, arch bridge systems.

 

Bridges & Highway Retaining Walls Meet TXDOT Specifications

 

Precast Arch-Box Units for Construction of Bridges & Overpasses

 

SFC Bridge Systems, a division of Speed Fab-Crete Corporation, designs, manufactures and assists in the installation of 3-sided concrete arch bridge systems. These clear span, environmentally friendly arch structures are economical, durable and virtually maintenance free. Typical uses are roadway stream crossings, pedestrian walkways and tunnels.

 

Speed Fab-Crete is a prime Southwest regional producer of precast components for bridges and overpasses. The arched concrete sections are available in a series of modular systems, ranging from 12 to 48 feet, variable heights and lengths determined by the number of units placed end-to-end.

 

  • Speed Fab-Crete plant produced for faster installation
  • Total set-in-place construction
  • Modular systems from 12 to 48 feet
  • Backfilling can begin immediately
  • Easily enhanced with architectural treatments
  • Texas Department of Transportation (TXDOT) approved

 

The custom designed precast system, approved by the Texas Department of Transportation, allows for total "set in place" construction of bridges, overpasses, culverts and underground structures, including requirements for retention and containment. Backfilling of these bridge configurations can begin immediately! The arch system also allows for curved alignments.

 

The off-site fabrication and production assures faster installation, minimizes road closings and detours and eliminates costly maintenance of an exposed bridge deck and bridge deck icing.

 

The versatility of the arch-box system makes it cost effective and appealing for a variety of other applications, including wine storage, airports, railroads, golf courses, boat passages, pedestrian walkways, storage, retention, enclosures and containment. All are easily enhanced with architectural treatments.

 

CONTACT US for a cost estimate on your next bridge and/or overpass construction project.

Contact

SFC Bridge Systems

Jeff Harwell

Division Manager

P (214) 717-1773

E jharwell@sfcbridges.com

CONTACT US

 

Corporate Office

1150 East Kennedale Parkway

Kennedale, Texas 76060

P (817) 478-1137

F (817) 561-2544

E info@speedfab-crete.com

 

Mailing Address

P.O. Box 15580

Fort Worth, TX 76119

 

PROJECTS

 

Public Buildings

School Buildings

Commercial Buildings

Auto Dealership Buildings

Religious Buildings

Specialty Facilities

DESIGN BY Speed Fab Crete  |  2016