Phone: (817) 478-1137

info@speedfabcrete.com

School Facilities

AGC Best Design-Build Project: Dale Keeling Athletic Center

 

AGC of America congratulates Speed Fab-Crete, who built the AGC-TEXO Chapter's most impressive design-build construction project.  Newly opened state-of-the-art Dale Keeling Field House for Everman ISD, part of an $18-million-dollar bond package accomplished entirely by Speed Fab-Crete General Contractors.

 

Speed Fab-Crete General Contractor has been named winner of the 2010 "Design-Build" category in Texas building competition sponsored by TEXO, the DFW chapter of Associated General Contractors.

 

The award went to Speed Fab-Crete as design-builder of a $5,500,000 field house for Everman Independent School District last year.  The 24,100-square-foot field house contains athletic facilities for the district's various level of football teams.

 

Callahan & Freeman Architects designed the angular shaped facility. A severely restricted site, in an end zone of the district's football stadium, required the unusual shape to maximize available space. Multiple windows of coaches' offices and the players' weight room face onto a curved track bordering the field.

 

Dale Keeling Athletic Center

 

The exterior of the field house is made of Speed Fab-Crete's precast concrete walls with limestone aggregate, and a partial veneer of two different colored bricks and a standing seam roof. The treatment ensured campus continuity with existing school buildings.

 

Everman's school superintendent, Dr. Jeri Pfeifer, said, "Given its purpose, our field house was the smartest design since the Pyramids. Given its size, this was the best bang-for-the-buck building I've ever seen."

 

Broaddus ISD High School Complex

 

The exterior features distinctive horizontal bands of two exposed rock aggregates for a perpetual fresh experience of this East Texas showcase school.

 

Lindsay ISD High School Lindsay, Texas

 

The Lindsay ISD regulation-sized gymnasium seats 700 people on telescoping bleachers. The facility opened in 2005.

 

Everman ISD Intermediate School—A Design-Build Project

 

Everman ISD Intermediate School (near Fort Worth, Texas) opened in 2005.  The facility includes 36 classrooms in a three wing configuration, joined by a commons area of wash basins, water fountains and restrooms.Other features of the 60,000 square foot school are a 325-seat cafetorium, a playnasium with sports carpet, library, computer rooms and administrative offices.

 

"Smartest design since the pyramids."

 

DR. JERI PFEIFER

Superintendent

Everman ISD, Texas

 

Download Whitepaper

CONTACT US

 

Corporate Office

1150 East Kennedale Parkway

Kennedale, Texas 76060

P (817) 478-1137

F (817) 561-2544

E info@speedfab-crete.com

 

Mailing Address

P.O. Box 15580

Fort Worth, TX 76119

 

PROJECTS

 

Public Buildings

School Buildings

Commercial Buildings

Auto Dealership Buildings

Religious Buildings

Specialty Facilities

DESIGN BY Speed Fab Crete  |  2016